The design of Phase 3 & 4 of Niagara Street reconstruction (Porter Avenue to Ontario Street) has been awarded by the City of Buffalo to Watts Architecture and Engineering. Their team includes: Stoss Landscape Urbanism (from Boston, MA-for green infrastructure and landscape design); the UB Regional Institute (for public input and outreach), Alta Planning+Design (bicycle facilities and planning), Frandina Engineering & Land Surveying (for survey & stakeout) and Think Outside the Square (for wayfinding/interperative signage).
Projected completed construction is 2017.
Follow all the updates on NiagaraStreetNow website.